The torsion bar spherical conversion will be $200.00.
This will include the following:
2 aluminum adapter sleeves
2 double sealed spherical bearings (pressed in)
2 grease nipples (including shields and nuts)
2 torsion arm spacers
2 retaining bolts
Drill bits and Tap
The control arm kit is $200.
This kit will include:
2 aluminum adapter sleeves
2 double sealed spherical bearings (pressed in)
4 retaining bolts
2 grease nipples
4 inner adapters
Drill bits and Tap
As a group buy were are going to do these two sets for a total of $375.
For those who are getting the trailing arm kits at the same time, they will be $175-$25 discount for a total of $150 + $375 = $525.
Please send all deposits to [email protected] via www.PayPal.com
To see the entire thread about how these are made and tonnes of photos including install please visit the page below. Entire kit photos will be added to this thread as they are built.
http://www.redpepper...opic=54250&st=0
Group Buy Members:
Aren D. deposit paid
Dwend (full kit) Paid deposit paid 12mm
87MugenProCr-X deposit paid
Power Wheels deposit paid +
ATXBoy (full kit)
Vicious (full kit)
Cahitapower deposit paid
Anjin (full kit)
TimmyDogg
ED Funk deposit paid for two sets $500
2
Spherical Torsion Bar And Spherical Control Arm Group Buy
Started by chedda_j, Sep 26 2012 03:13 PM
34 replies to this topic
#1
Posted 26 September 2012 - 03:13 PM
#2
Posted 26 September 2012 - 08:32 PM
I'm not going to be able to go on on the gb, but you'll be continuing to make these like all your other items yes? Because one day I will have the money.
Sent from my GT-I9000 using Tapatalk 2
Sent from my GT-I9000 using Tapatalk 2
#3
Posted 26 September 2012 - 11:06 PM
#4
Posted 27 September 2012 - 12:08 PM
#5
Posted 28 September 2012 - 11:31 PM
Thanks everyone, looking for just a couple more before I can order the materials. The lists have been updated to show who has put money down.
#6
Posted 30 September 2012 - 09:12 AM
#7
Posted 30 September 2012 - 11:20 AM
Oh shoot I forgot to add my PayPal email. It's [email protected] . If you don't have a PayPal account, they are very easy to set up and 100% secure. Just visit www.PayPal.com and when you pay please include what your purchasing in the bottom heading.
#8
Posted 06 October 2012 - 02:01 AM
Chedda i will make my deposit next Wednesday, I just came back from Vacation and had some bills to pay...but will be in next week for sure...
#9
Posted 06 October 2012 - 07:40 AM
wait how much is the deposit?
Dark Side of the Power........
Wheels
QUOTE (RARECRX @ Jun 26 2009, 06:55 PM)
The ONLY BMW's I like are (Beautiful Mexican Women)
Wheels
QUOTE (RARECRX @ Jun 26 2009, 06:55 PM)
The ONLY BMW's I like are (Beautiful Mexican Women)
#10
Posted 06 October 2012 - 01:01 PM
Deposit is $150 to essentially pay for the materials. I will make them and expect the rest when each kit is completed.
#11
Posted 07 October 2012 - 04:27 AM
in that case, can you add me to the list? i'll be able to send a deposit next week.
Dark Side of the Power........
Wheels
QUOTE (RARECRX @ Jun 26 2009, 06:55 PM)
The ONLY BMW's I like are (Beautiful Mexican Women)
Wheels
QUOTE (RARECRX @ Jun 26 2009, 06:55 PM)
The ONLY BMW's I like are (Beautiful Mexican Women)
#12
Posted 08 October 2012 - 08:42 PM
#13
Posted 11 October 2012 - 12:18 AM
Here's a couple photos of the redesigned rear trailing arm sphericals. These are just the housings, but I will have some updated photos soon.
#14
Posted 28 October 2012 - 11:55 PM
Ahh well I'm still waiting on materials sadly. They F'ed up real bad ended up charging me three different times. Once for $411, then for $540, then for $411 again. Trust me I was not happy when I went to go use my visa and I was out of money. So we got everything straightened out and the materials are finally being shipped. They also had to do allot of processing with this order, as I had all the materials cut to length rather than me doing so that when I receive the materials I can blast right through making them allot faster (no cutting).
I got some of the kits packaged. Here is a photo.
I will keep everyone up to date, thanks for the patience.
I got some of the kits packaged. Here is a photo.
I will keep everyone up to date, thanks for the patience.
#15
Posted 29 October 2012 - 06:14 AM
When do you want the full payment?
anjin aka Ian
"I can't believe it - Ive just been passed by a sh!tbox"
"I can't believe it - Ive just been passed by a sh!tbox"